Authority concept · Field Ratio Architecture + Engineering

Six questions that belong before the drawing set.

This is not a content-volume strategy. Each article corresponds to an owner decision that can materially change project scope, procurement, or coordination.

Exposed structural and building-service zone showing duct, conduit, and access relationships.

Renovate or replace?

Frame the comparison around program fit, condition, technical systems, phasing, site, adaptability, and total project assumptions.

Existing-building unknowns

Decide which unknowns need field investigation before design or pricing relies on them.

Engineering in feasibility

Bring structural/systems questions forward when they can invalidate an option.

Occupied-facility phasing

Treat temporary routes, interruptions, safety separation, and operational continuity as design inputs.

Programming

Use workflows, adjacency, area, and operating needs to test the project—not just create a room list.

Owner RFQ preparation

Define project premise, phase, procurement path, constraints, available information, and decision criteria before requesting teams.

TruePoint concept · fictional A/E practice · Built for Aster