Project + facility
Company, facility type, general city/state, and whether work is manufacturing, food processing, logistics, municipal, or another operating environment.
Surface need
Select protective coating, concrete repair, containment surface, shutdown restoration, industrial flooring, or “not sure.”
Condition + quantity
Area/quantity, substrate, known deterioration, existing system, and exposure/traffic/cleaning context.
Operating constraints
Live operations, access/isolation limitations, target shutdown or work window, and desired return-to-service timing.
Documents
Specification/drawing availability may be stated. Optional public-demo upload is illustrative only and should accept only non-sensitive files in production.
Do not send
No plant-security plans, access credentials, controlled process information, PHI/PII, hazardous-material declarations, regulated export data, or controlled procurement documents through a public intake.
