Before pricing
Collect area/quantity, substrate, condition, existing system, exposure, access, operating constraints, target window, specification status, desired return-to-service timing, and safe photos/drawings.
Before shutdown
Confirm isolation/access readiness, actual quantities, staging, repair sequence, environmental conditions, cure requirements, inspection/hold points, and who authorizes return to service.
Before system selection
Separate owner/specifier exposure requirements from contractor execution. Product/system decisions depend on substrate, service environment, prep, temperature/moisture, traffic, and applicable specifications.
Before upload
Do not send sensitive plant-security information, controlled process details, hazardous-material declarations, credentials, or controlled procurement documents through the public concept form.